The property located approximately 200m2 south from Ayios Athanasios round-about. The building consists of 1,032 semi-basement, 2,821m2 ground floor (labaratory), 245m2 ground floor (warehouse), 1,590m2 mezzanine and 823m2 offices.
The property lies within Planning Zone Ββ2 (Governmental industrial area) with a maximum building ratio of 90%, coverage ratio of 60%, on 2 floors.