Project consists of two four storey building with one, two and three-bedroom apartments with a total of twenty apartments.
The new development is under construction and the delivery date will be on September 2022.
- Certificate of Energy Efficiency A.
- Covered parking for each apartment.
- Storage room for each apartment.
- Video entry phone on the main entrance.
- Double glazed thermal windows.
- Double Glazed Glass on the balconies.
- High quality electric system (lift).
- High quality sanitary ware chosen by customer.
- Pressurised water system.
- Electric heating provision.
- Provisions for wall mounted air condition split units.
- Installation of electric shutters in the bedrooms.
- Installation of photovoltaic system on the roof.
There are three 3-bedroom apartments available.
Covered area 103 sq.m.
Covered veranda 25.90 sq.m.
PLUS V.A.T